Total project

ATS Groep manufactured a completely new installation for an international manufacturer of reinforced concrete and pre-stressed structures for the tensioning and de-tensioning of steel cables laid in the prestressed concrete, and this with a length of no less than 130 metres.

For this project we took care of the entire engineering work, the hydraulic units, the mechanical work, the hydraulic piping, the electrical boxes and terminal cabinets, automation and installation.