Our customer Ecofrost contacted us to say that an old robot had broken down. As the robot is a crucial part of the automatic production, action had to be taken very quickly.

The ATS Group robotics team started a race against the clock.

An alternative was sought and proposed within a period of only eight working days.

  • The robot was ordered, delivered and installed.
  • The cabling was redone.
  • The necessary mechanical works were carried out.
  • The programming was changed.

After 8 working days, production could be restarted successfully.

A robot project was completed in record time thanks to the efforts of the entire Robotics team.